Gas Fired Steam Generator

Gas Fired Steam Generator. Compare capacity, pressure and installation requirements for your application.

Gas Fired Steam Generator

Product Overview

Gas Fired Steam Generator. For process steam, specify the required steam output and working pressure, available fuel, daily operating hours and feedwater conditions. Compare the model specifications below and confirm the selected configuration and accessories in the quotation. Inspection, registration and operator requirements depend on the equipment and installation country. Confirm applicable requirements before ordering. Installation, operation and maintenance must follow the equipment documentation and applicable requirements.

Key Features

  • 3-Minute Fast Steam
  • Confirm local inspection requirements
  • 99% Condensing Efficiency
  • Ultra-low NOx (<30mg)
  • Modular Energy Saving

Technical Specifications

Gas Fired Steam Generator - Technical Specifications
ModelRated CapacityPressureEfficiencyFuelWater CapacityConsumptionSteam TempExhaust TempThermal Power (kW)
LSS-0.1100 kg/h0.7 MPa98%Natural Gas / LPG<30 LNG: ~7-8 m³/h | LPG: ~6 kg/h171°C<60°C70 kW
LSS-0.2200 kg/h0.7 MPa98%Natural Gas / LPG<30 LNG: ~14-16 m³/h | LPG: ~12 kg/h171°C<60°C140 kW
LSS-0.5500 kg/h0.7 / 1.0 MPa99%Natural Gas / LPG<50 L (Modular)NG: ~35-38 m³/h | LPG: ~28 kg/h171 / 184°C<55°C350 kW
LSS-1.01000 kg/h0.7 / 1.0 MPa99%Natural Gas / LPG<50 L * 2NG: ~70-75 m³/h | LPG: ~56 kg/h171 / 184°C<55°C700 kW
LSS-2.02000 kg/h0.7 / 1.0 MPa99%Natural Gas / LPG<50 L * 4NG: ~140-150 m³/h | LPG: ~112 kg/h171 / 184°C<55°C1400 kW

Confirm the selected model, operating conditions, scope of supply and destination requirements in the quotation. Efficiency and consumption depend on the fuel, load and test conditions; catalog figures alone are not a performance guarantee.

What to specify for your project

Specify steam demand in kg/h, pressure, batch or continuous operation, fuel or electrical supply, water conditions and installation country. Confirm local inspection requirements for the selected model.

Steam Generators

Frequently Asked Questions

Inspection, registration and operator requirements depend on the equipment and installation country. Confirm applicable requirements before ordering. Installation, operation and maintenance must follow the equipment documentation and applicable requirements.
Yes, our modular control system allows you to connect multiple generators in parallel. They will automatically turn on/off based on total steam demand, saving energy compared to one large boiler.
Send the installation country and required standards with your inquiry. Request the documents applicable to the selected model and confirm their scope and validity before ordering.
Delivery schedule, installation support, warranty coverage and payment terms must be confirmed in the written quotation and order for the selected model and destination.

Request a quotation

Explore steam boilers, hot water boilers, steam generators, thermal oil heaters and hot air heaters. Compare fuel and model specifications, then send Henan Yudong Boiler your project requirements.

Chat on WhatsApp
Call: +86-187-3940-8082
Get a Free Quote